View from the top of the steps between the Shaw and Bird-Werner porches, looking down the walkway between the two buildings. The Shaw kitchen is to the right, where the cribbing is positioned. The trench is for the footing and new block foundation, part of which can be seen just above the lower end of the railing.
February 4, 2010 – Photo 1A
March 7, 2010